Start-up & commissioning for supervisory and validation software
Service support during the integration of the solution with the plant control system
- Consultancy during the integration with other software platforms
- On-site commissioning services
- Assurance of a smooth and continuous operation in the field
- Training of staff before and/or after system implementation
Start-up & commissioning for supervisory and validation software
Service support during the integration of the solution with the plant control system
- Consultancy during the integration with other software platforms
- On-site commissioning services
- Assurance of a smooth and continuous operation in the field
- Training of staff before and/or after system implementation
Overview
Implementing a project can be a complex and costly process starting at the initial kick-off meeting to the final commissioning. During this phase professional support by an experienced partner is highly valuable. Based on over 30 years of experience in supervisory & validation software projects KROHNE offers start-up & commissioning services to guarantee smooth and continuous operation in the field. We take care of the whole project lifecycle from planning to commissioning.
KROHNE offers a wide range of services to ensure a trouble-free implementation. Project management is performed according to ISO 9001 during all phases of the project including Factory Acceptance Tests (FAT), Integrated Factory Acceptance Tests (IFAT), Site Acceptance Tests (SAT) and Performance Acceptance Tests (PAT). Our commissioning engineers guarantee that communication between all systems from the field to the control room are set-up correctly. Additionally they take care of the installation and wiring of the hardware equipment.
To get the most out of our software and achieve maximum operational benefit, KROHNE offers a variety of trainings from basic operator introduction, to the more advanced maintenance and configuration features.
Product features and options depend on device configuration: Contact us to make sure that your preferred functionality can be combined in one device.
- Project management according to ISO 9001
- Kick-Off meetings
- Inspection of instrumentation and communication from the field to the control room
- Factory Acceptance Tests (FAT), Integrated Factory Acceptance Tests (IFAT), Site Acceptance Tests (SAT) and Performance Acceptance Tests (PAT)
- Documentation from basic engineering to detailed design documents
- Installation and wiring of hardware equipment
- Operator, engineer and maintenance trainings and workshops